  "name": "FoshanBuild Evidence Library",
  "page": "https://foshanbuild.com/evidence/",
  "page_zh": "https://foshanbuild.com/zh/evidence/",
  "updated": "2026-08-21",
  "policy": "Every public record states what the evidence can show, what it cannot show, its date, and its privacy boundary.",
  "privacy": "Client names, exact addresses, private messages, personal contacts, QR codes, customer prices, margins, and internal source systems are not published.",
  "records": [
    {
      "id": "scope-boq",
      "type": "BOQ and scope record",
      "title": "461-page BOQ and 28-package planning structure",
      "title_zh": "461 页 BOQ 与 28 个采购包规划结构",
      "source_page": "https://foshanbuild.com/cases/#west-africa-coastal-resort-planning",
      "source_page_zh": "https://foshanbuild.com/zh/cases/#west-africa-coastal-resort-planning",
      "evidence_date": "2026-07-27",
      "evidence_state": "text_only_record",
      "linked_case_id": "west-africa-coastal-resort-planning",
      "public_asset_urls": [],
      "summary": "An anonymized resort scope was separated into priority RFQ, clarification-led, and local-contractor packages.",
      "can_show": "Recorded scope scale, package classification, environmental questions, and a planning milestone.",
      "cannot_show": "A fixed quote, purchase order, EPC commitment, delivery, installation, or completed project.",
      "summary_zh": "一个匿名度假项目被拆分为优先 RFQ、技术澄清和当地承包范围。",
      "can_show_zh": "已记录的范围规模、采购包分类、环境问题与规划节点。",
      "cannot_show_zh": "固定报价、订单、EPC 承诺、交付、安装或已完成项目。"
    },
    {
      "id": "site-drawings",
      "type": "Site and drawing record",
      "title": "Australian field brief, 21 photos, three walkthroughs, and drawing handoff",
      "title_zh": "澳洲现场任务书、21 张照片、3 段走查与图纸交接",
      "source_page": "https://foshanbuild.com/insights/australia-site-measurement-process/",
      "source_page_zh": "https://foshanbuild.com/zh/insights/australia-site-measurement-process/",
      "evidence_date": "2026-07-29",
      "evidence_state": "text_only_record",
      "linked_case_id": "australia-remote-site-measurement",
      "public_asset_urls": [],
      "summary": "A field-record process linked design questions, site capture, editable files, and a second dimensional check.",
      "can_show": "How site information was requested, indexed, returned, questioned, and handed to the project team.",
      "cannot_show": "Licensed surveying, a final production dimension, approved compliance, or completed installation.",
      "summary_zh": "一套现场记录流程把设计问题、现场采集、可编辑文件和二次尺寸复核连接起来。",
      "can_show_zh": "现场资料如何被要求、编号、回传、质疑并交给项目团队。",
      "cannot_show_zh": "持牌测量、最终生产尺寸、已批准合规或已完成安装。"
    },
    {
      "id": "supplier-comparison",
      "type": "Supplier and model comparison",
      "title": "IWF Shenzhen field review, recorded-discussion matrix, and two model schedules",
      "title_zh": "IWF 深圳现场考察、对话矩阵与两套型号表",
      "source_page": "https://foshanbuild.com/insights/shenzhen-commercial-fitness-equipment-sourcing-review/",
      "source_page_zh": "https://foshanbuild.com/zh/insights/shenzhen-commercial-fitness-equipment-sourcing-review/",
      "evidence_date": "2026-08-15",
      "evidence_state": "original_field_record_and_client_report_render",
      "linked_case_id": "shenzhen-commercial-fitness-equipment-review",
      "public_asset_urls": [
        "https://foshanbuild.com/assets/insights/shenzhen-commercial-fitness-equipment-sourcing-review/iwf-shenzhen-hall-overview-original.webp",
        "https://foshanbuild.com/assets/insights/shenzhen-commercial-fitness-equipment-sourcing-review/client-report-preview-insight-evidence.webp"
      ],
      "summary": "Original field material and supplier statements were organized into an evidence-labelled buying recommendation and order-readiness checklist.",
      "can_show": "Two days of fieldwork, 31m53s of recorded discussion, exact model schedules, and client deliverables.",
      "cannot_show": "A production-factory audit, verified capacity, order, payment, production, shipment, installation, or acceptance.",
      "summary_zh": "原始现场材料和供应商陈述被整理成带证据标签的采购建议与下单准备清单。",
      "can_show_zh": "2 天实地工作、31 分 53 秒对话、准确型号表与客户交付物。",
      "cannot_show_zh": "生产工厂审核、已核实产能、订单、付款、生产、发货、安装或验收。"
    },
    {
      "id": "qc-boundary",
      "type": "QC record",
      "title": "Window-system factory visual QC and certification boundary",
      "title_zh": "门窗系统工厂视觉质检与认证边界",
      "source_page": "https://foshanbuild.com/insights/window-systems-factory-visual-qc-boundary/",
      "source_page_zh": "https://foshanbuild.com/zh/insights/window-systems-factory-visual-qc-boundary/",
      "evidence_date": "2026-08-08",
      "evidence_state": "anonymized_project_record",
      "linked_case_id": null,
      "public_asset_urls": [
        "https://foshanbuild.com/assets/insights/window-systems-factory-visual-qc-boundary/01-window-units-staged-for-review.webp",
        "https://foshanbuild.com/assets/insights/window-systems-factory-visual-qc-boundary/02-window-hardware-and-track-detail.webp",
        "https://foshanbuild.com/assets/insights/window-systems-factory-visual-qc-boundary/03-window-dimension-check.webp"
      ],
      "summary": "Factory photographs are organized by the visible checks they can support and the technical claims they cannot prove.",
      "can_show": "Appearance, visible hardware or track details, and the fact that a dimension-check action was recorded.",
      "cannot_show": "Certified performance, full concealed construction, project suitability, local approval, or every production unit.",
      "summary_zh": "工厂照片按其可支持的可见检查及无法证明的技术声明分类。",
      "can_show_zh": "外观、可见五金或轨道细节，以及已记录尺寸复核动作这一事实。",
      "cannot_show_zh": "已认证性能、完整隐蔽结构、项目适用性、当地批准或所有生产单元。"
    },
    {
      "id": "record-separation",
      "type": "Record-separation evidence",
      "title": "Separate installation, product-check, and factory records",
      "title_zh": "分开安装、产品检查与工厂记录",
      "source_page": "https://foshanbuild.com/insights/separating-installed-joinery-qc-and-factory-records/",
      "source_page_zh": "https://foshanbuild.com/zh/insights/separating-installed-joinery-qc-and-factory-records/",
      "evidence_date": "2026-08-08",
      "evidence_state": "anonymized_derivative",
      "linked_case_id": null,
      "public_asset_urls": [
        "https://foshanbuild.com/assets/insights/separating-installed-joinery-qc-and-factory-records/01-product-dimension-check-separate-record.webp",
        "https://foshanbuild.com/assets/insights/separating-installed-joinery-qc-and-factory-records/02-wardrobes-factory-stage-separate-record.webp",
        "https://foshanbuild.com/assets/insights/separating-installed-joinery-qc-and-factory-records/03-pendant-installation-separate-record.webp",
        "https://foshanbuild.com/assets/insights/separating-installed-joinery-qc-and-factory-records/04-installed-feature-joinery-separate-record.webp"
      ],
      "summary": "Public photographs from different stages and records are kept separate instead of being presented as one order.",
      "can_show": "The evidence state, stage, visible subject, public-edit boundary, and why separate records should not be merged.",
      "cannot_show": "That every image belongs to one customer, one supplier, one shipment, or one completed project.",
      "summary_zh": "不同阶段和不同记录的公开照片保持分开，不被包装成同一订单。",
      "can_show_zh": "证据状态、阶段、可见对象、公开编辑边界及不应合并记录的原因。",
      "cannot_show_zh": "所有图片属于同一客户、供应商、货运或已完成项目。"
    }
  ]
}