Sample files

See the kind of records a project should leave.

These example files show a simple item schedule, inspection and packing checklist, and installation handover note.

Example files

A good order should leave more than chat messages.

Buyers, suppliers, forwarders, and installers all need something they can check. These files show the kind of records we try to keep during a mixed furniture and building-material order.

Send your project
CSV

Example item schedule

Room, category, item, specification, quote basis, check point, packing note, and approval status.

Open file
TXT

Inspection and packing checklist

A checkpoint list before final payment, packing, and container loading.

Open file
TXT

Installation handover notes

Room tags, loading sequence, missing-item log, and local installer handover reminders.

Open file
JSON

Structured example data

A structured version of the example records.

Open file

These files are only examples of format. Every real project needs its own item schedule, drawings, quantities, destination checks, and service scope.

Item schedule sample

Example item schedule rows

Example data only. Real projects add supplier quote, CBM, drawing version, payment milestone, production photo links, and issue owner.

CodeRoomCategoryItemSpecificationQtyQuote basisQC pointPacking noteStatus
FB-001 Living room Loose furniture Modular sofa set 3.2 m fabric sofa, walnut side table, approved warm grey fabric 1 set EXW Foshan, sample fabric approved before deposit Fabric color, frame, cushion density, leg finish Carton plus corner protection, room label LIVING-01 Sample finish approved
FB-002 Kitchen Cabinetry Kitchen cabinets L-shaped kitchen, plywood carcass, matte lacquer doors, Blum-equivalent hardware 1 package Shop drawing required, hardware list separated Carcass thickness, door finish, hinge model, pre-assembly photos Flat-pack crates, cabinet code label by elevation Drawing revision pending
FB-003 Bathrooms Sanitary ware Bathroom system package 3 bathroom vanities, basins, toilets, shower screens, taps, drains, accessories 3 sets Accessory list and spare parts confirmed by set Ceramic surface, faucet finish, glass size, drain compatibility Fragile labels, foam protection, set label BATH-01 to BATH-03 Quote basis confirmed
FB-004 Facade Doors and windows Aluminium window package Powder-coated aluminium frames, double glazing, insect screens where required 100 sqm Glass specification and target market compliance to be checked locally Frame profile, glass label, hardware, opening direction, drainage holes Wooden crate, elevation label, installation note attached Compliance questions open
Inspection and packing checks
  • Confirm final product photos, dimensions, finish, hardware, and accessories before balance payment.
  • Keep packing photos with labels visible, especially for glass, stone, furniture, cabinet panels, and small hardware.
  • Record missing items, damaged surfaces, wrong finish, unclear labels, and supplier promised replacement dates.
  • Check CBM, gross weight, crate dimensions, loading order, and fragile zones before handoff to the forwarder.
Installation handover reminders
  • Use room tags and item codes so the local installer can match cartons to the correct room.
  • Prepare a first-open list for fragile or high-value items that should be inspected immediately after delivery.
  • Separate factory installation notes from local compliance or engineering responsibility.
  • For the right projects, paid site guidance can help with sequence, issue checking, and final placement.
Why this matters for overseas buyers

The common failure is not a lack of suppliers. It is no unified schedule, no approval record, no packing evidence, and no handover note for the local installer.

Send your room list, drawings, or supplier quote.

We will tell you what is missing and what the next buying step should be.