Furniture · Cabinetry · Building materials

Whole-home sourcing from China.

Bring your furniture, cabinetry and building materials into one considered plan. Vincent coordinates your design requirements, suppliers, quality checks and delivery handoff from Foshan.

Start with a floor plan, a room list or a few reference images.

Installed feature-wall joinery in a separate anonymized residence
Installed joinery · Separate anonymized project record; not whole-home acceptance. View record

Selected residential projects

Real homes. The details behind them.

Explore all project records

Our role

Your design. One coordinated buying plan.

FoshanBuild is a buyer-side whole-home sourcing and procurement service in Foshan, China, for overseas homeowners, designers and owner representatives.

Furniture, cabinetry, doors, windows, stone, tiles, bathrooms, lighting and soft furnishings—organized by room, specification and decision. Visit Foshan or work with us remotely.

01

Design coordination

Turn drawings and references into buying requirements.

Organize room-by-room products, specifications, samples and supplier questions with your designer.

Deliverable: buying scope, specifications and open decisions.

The owner and appointed designer approve the design; local professionals retain engineering and statutory approval.

Working with your design team
02

Procurement

Compare suppliers on the same basis.

Review materials, configuration, quantities, trade terms, lead times and exclusions across suitable routes.

Deliverable: original quotes, a comparison and approval records.

The seller, payment recipient and FoshanBuild service fee stay identifiable. The buyer approves the purchase.

Our buyer-side policy
03

Quality checks

Check against what was approved.

Connect agreed inspection points to drawings, samples and model numbers; track issues and corrections.

Deliverable: inspection records, issues and their status.

Visual QC is not performance certification. Test documents and destination suitability need separate review.

What quality checks cover
04

Export & handoff

Connect the order to its next destination.

Coordinate packing lists, room labels, package counts, loading records and shipment-information handoff.

Deliverable: packing and handoff records, with open items.

Carriers, insurers, customs brokers and local installers retain their responsibilities, agreed for each project.

Shipping and handoff guides
Vincent Wang

Your project lead in Foshan

Your main contact, from Foshan onward.

Vincent Wang coordinates the people and product details behind your project. His hands-on experience includes two visits to Dubai to support project implementation. Scope and responsibilities are agreed at each stage.

Meet Vincent & the team Contact the project lead

Working on the buyer’s side

Clear scope. Visible fees. Defined responsibilities.

Understand the product scope, service fee and third-party costs before making a decision. Shipping, installation and after-sales responsibilities are clarified for each project.

Read our commercial rules

Original quotations

Seller-issued quotes and revisions stay visible. Product cost and our service fee are stated separately.

Independent comparisons

At least three suitable independent routes for significant categories where viable; otherwise, we state the count and reason.

Transparent interests

Any supplier-side benefit is disclosed in writing, with its treatment. Payment recipients are clear before deposit.

Before we begin

A few useful answers.

Do I need a complete design or buying list?

No. Start with a floor plan, room list or reference images. We can discuss the scope, destination and timeline, then identify what your designer or suppliers still need to confirm.

Can we work remotely, or should I visit Foshan?

Both are possible. Visits begin with a review of your plans and categories before appointments are arranged. Remote work progresses through specifications, samples, quotations and recorded approvals.

Do you take responsibility for design, certification and installation?

FoshanBuild coordinates design requirements and China-side procurement. Design approval, engineering, certification and local installation remain with the responsible professionals or contracting parties.

How are product prices, service fees and shipping separated?

Formal comparisons keep original supplier quotations visible and state the procurement-coordination fee separately. Testing, packing, freight, insurance, taxes and local installation are confirmed by project.

Start with your project

Where are you with your home?

Tell us the destination, the products you need and your timeline. Plans or references help; a complete buying list is not needed for the first conversation.

Discuss your projectChoose email or WhatsApp for your replyView all contact options
Sourcing process, buyer guides & further project records

Our Workflow

From initial concepts to a shipment-ready container.

Each step advances one clear decision and leaves a usable record for the next stage.

01

Project Evaluation

Submit your destination, floor plans, reference images, and budget parameters for a professional feasibility assessment.

02

Supplier Shortlisting

We objectively evaluate suppliers based on quality standards, export experience, cooperativeness, and pricing structure.

03

Pre-shipment Inspection

We coordinate visual and document checks against the written approval baseline, record exceptions, and report what remains open before the buyer decides on balance-payment release.

04

Logistics Coordination

We coordinate packing labels, package counts, loading information, and export-document handoff with the named seller or exporter and forwarder; each party retains its stated responsibility.

Review original supplier quotations and the separately stated service fee before confirming the buying scope.

Choose by buyer question

Global project reach

Sourcing support from Foshan to projects worldwide.

Our Foshan team can support projects in the countries and regions shown here. Send the location, drawings, or buying list and we can start planning the route.

Open the full global map

Loading map…

Drag or use + / − to explore regions, then select a location to view our service reach.

Start with what you have

Start with the plan, list or quote you have.

Send the file you already have. We first identify what can stay, what needs checking, and the next useful step. You do not need a finished BOQ or a new selection exercise before contacting us.

A plan or room list

We group the rooms and sourcing categories, keep the drawing revision visible, and flag missing dimensions instead of turning assumptions into production sizes.

Working record: Room/category schedule with source notes and open items.

Products you have already chosen

Your selection stays as the baseline. We check specifications and availability against it; any suggested alternative sits separately with the reason for the change.

Working record: Keep / check / optional-alternative list for your decision.

An existing supplier quote

We compare like-for-like items and make the currency, price unit, quantities, validity, trade term and exclusions visible. Supplier-contact status stays separate from a checked offer.

Working record: Comparable quote record, unresolved items and the next decision.

Open a sample review record

Illustrative format only: fictional entries, no quoted prices. This is not a supplier offer, client result, certification, or agreed project scope.

EntryKeep visibleStill to verifyNext useful step
Chosen vanityThe buyer's selected model stays on the main list.Dimensions, finish code and included fittings.Check the missing fields; show any alternative separately for approval.
Supplier contactPublic contact found; supplier not yet contacted.Availability, scope and whether an offer can be issued.Buyer contacts directly, or requests coordination within an agreed scope.
Product-only quotationOriginal currency, unit, quantity, quote date and validity; EXW product scope.Packing details and separately stated transport, tax and installation costs.Compare the same basis. Keep any currency conversion and exclusions visible.

See the method in a dated public record: The coastal-resort record shows how a BOQ was split into sourcing, clarification and local-contractor packages. It records a planning milestone, not a completed purchase or delivery. Read the planning record — July 27, 2026

Read the selection, supplier-status and quotation rules

Appointment-based private-residence visits

Most projects need at least three to five days; full-scope coverage is normally planned from seven days.

Three days is the focused minimum and five days supports broader category work. Routes are pre-screened for high-end homes and large residences. Submitted dates create a review request; showroom, factory, supplier, and timing availability require written confirmation.

Open the full visit service
3–5

Minimum on-site project structure

Three days is the prepared, focused minimum; five days can add related categories, samples, quotation review, and second checks.

Compare three- and five-day routes
7+

Normally recommended for full scope

When the goal is to cover the complete buying scope across materials, fixed joinery, furniture, lighting, bathrooms, and soft furnishings, plan from seven working days.

Review the seven-day-plus scope

Written buyer-side policy

Buyer-side is not a slogan. It is five commercial rules a buyer can check.

Use one controlled RFQ, see original quotes, separate the fee, disclose supplier-side benefits, and identify the payment recipient.

Read the full policy
3+
independent comparable routesFor significant categories; disclose the actual count and reason when fewer viable routes exist.
Original
EXW / FOB quotes visibleKeep seller-issued documents and negotiated revisions traceable in the formal comparison.
Around 5%
service fee shown separatelyDo not hide procurement coordination inside an unexplained product total.
0
undisclosed supplier-side benefitsCommission, rebate, referral, or kickback must be disclosed and handled in writing.

Project case studies

A closer look at how we work.

Follow each project from the original brief through the work completed and the latest update on August 15, 2026.

See full project case studies
Ongoing

Gold Coast, Australia

Australian Gold Coast Residence

Site measurement, multi-category sourcing, and design-change coordination

Buyer problem

A private residence needed reliable site records, coordinated Foshan selections, and controlled design changes across custom joinery, appliances, furniture, lighting, and related materials.

Record
21 site photos
Record
3 zone walkthrough videos
Record
1 source structural DWG
Latest update

The site record is complete and the active kitchen brief now reflects the island cooking layout, revised oven direction, and outstanding Australian compliance evidence.

View project record
Planning milestone completed

West Africa (anonymized)

Coastal Resort Procurement Planning

461 BOQ pages organized into 28 sourcing packages

Buyer problem

A coastal resort brief contained thousands of procurement references that had to be separated into China-supply, technical-clarification, and local-contractor scopes before reliable supplier RFQs could begin.

Record
461 BOQ pages
Record
28 sourcing packages
Record
1,420 product references
Latest update

We have reviewed all 461 BOQ pages and divided the work into 28 sourcing packages. The client is now choosing which packages to quote first.

View project record
Ongoing

Oregon, United States

Oregon Custom Residence

Drawing-led windows, finishes, packing, and logistics coordination

Buyer problem

A custom residence needed design intent mapped into comparable product workstreams before windows, doors, flooring, stone, packing, and logistics decisions could be controlled.

Record
Approx. 4,200 SF
Record
55 buying tasks
Record
Plans, elevations, and renders
Latest update

The plans, elevations, renderings, and product requirements are now sorted by room and category, ready for supplier comparison and quotation work.

View project record

Send your furniture, building-materials, or project list on WhatsApp.

We will tell you what is missing and what the next buying step should be.

Send Your List on WhatsApp

Contact Vincent directly

For both new and existing projects, you can now contact Vincent directly on WhatsApp.

Message Vincent on WhatsApp

Unable to open WhatsApp? info@foshanbuild.com

WhatsApp